Title of article :
Pressure oxidative leaching of lead-containing copper matte
Author/Authors :
Jin، نويسنده , , Bingjie and Yang، نويسنده , , Xianwan and Shen، نويسنده , , Qingfeng، نويسنده ,
Issue Information :
روزنامه با شماره پیاپی سال 2009
Pages :
5
From page :
57
To page :
61
Abstract :
The pressure oxidative leaching of lead-containing copper matte is studied systematically. The effects of leaching time, oxygen partial pressure, leaching temperature, agitation speed, acid addition and initial Cu2+ concentration on the extraction of copper and iron are investigated. The effect of initial Cu2+ concentration is insignificant compared to the other reaction parameters. The best found conditions are: leaching time 2 h, oxygen partial pressure 0.8 MPa, acid addition 80% of matte mass, temperature 150 ± 5 °C and agitation speed 600 rpm. Under these conditions, > 95% Cu is extracted with the concentration of iron in solution < 5 g/L and the yield of sulfur is 20–30% of total sulfur mass. The leach residue is about 30% of the initial mass and the recovery of lead and silver is close to 100% and 98% respectively.
Keywords :
Copper–lead matte , pressure leaching , Oxygen , Lead sulfate , Copper
Journal title :
HYDROMETALLURGY
Serial Year :
2009
Journal title :
HYDROMETALLURGY
Record number :
2371754
Link To Document :
بازگشت