Title of article
Recovery of indium from used indium–tin oxide (ITO) targets
Author/Authors
Li، نويسنده , , Yuhu and Liu، نويسنده , , Zhihong and Li، نويسنده , , Qihou and Liu، نويسنده , , Zhiyong and Zeng، نويسنده , , Li، نويسنده ,
Issue Information
روزنامه با شماره پیاپی سال 2011
Pages
6
From page
207
To page
212
Abstract
A novel hydrometallurgical process was developed for the recovery of indium metal from used indium and tin oxide (ITO) targets, which includes acid leaching, removing tin from leach solution by sulphide precipitation and depositing sponge indium by zinc cementation. The leaching of indium reached 99% with ITO powder size of less than 75 um and initial acid concentration of 100 g/L H2SO4 at L/S ratio of 8–12 and 90 °C for 2 h, while only about 8% of tin was leached out. Tin in the leach solution was reduced to 10 mg/L and the loss of indium was less than 1% by sulphide precipitation under H2S partial pressure of 101.3 KPa and 100 g/L H2SO4 at 60 °C for 10 min. Pure sponge indium from purified In2(SO4)3 solution was obtained using zinc plate cementation at pH 1–1.5 and 65 °C.
Keywords
Waste indium–tin oxide , acid leaching , Tin sulphide , Zinc cementation , Indium
Journal title
HYDROMETALLURGY
Serial Year
2011
Journal title
HYDROMETALLURGY
Record number
2372492
Link To Document