Title of article :
External social capital and information systems development team flexibility
Author/Authors :
Chang، نويسنده , , Kuo-Chung and Wong، نويسنده , , Jiun-Hung and Li، نويسنده , , Yuzhu and Lin، نويسنده , , Yao-Chin and Chen، نويسنده , , Houn-Gee، نويسنده ,
Issue Information :
ماهنامه با شماره پیاپی سال 2011
Pages :
9
From page :
592
To page :
600
Abstract :
Context search based on the socio-technical perspective suggests that two sources of socio-technical change have a bearing on the performance of information systems development (ISD) projects: business requirements and development technology. To enhance project effectiveness, ISD teams need to enhance their flexibility in the face of the constant changes taking place from business and technical environments in which they operate. Flexibility is conceptualized as an outcome of capability development through constantly integrating and reconfiguring available resources within and outside of the organization where the team is embedded. ive rpose of this study is to examine the relationship between a team’s external social capital and team flexibility. More specifically, based on social capital theory, this study argues that external social capital leads to IS team flexibility, which in turn contributes to the successful project performance. ey design was selected to collect data and test the proposed model. A snowballing strategy was employed to collect data. 118 information systems developers participated in the survey and the model was analyzed using partial least squares regression. Results: The findings show that, in general, the ISD teams’ external social capital do contribute to the team’s response to changes. However, they exhibit unique impacts on ISD team flexibility respectively. s ndings show that, in general, the ISD teams’ external social capital does contribute to the team’s response to changes. However, they exhibit unique impacts on ISD team flexibility respectively. sion rious external social capitals have distinctive effects on a team’s flexibility. Specifically, horizontal relationships are positively associated with both business and technology flexibility. Vertical relationships are positively associated with business flexibility and market relationships technology flexibility. ISD managers should establish robust relationships with its high-ups, other lateral units, and third parties outside in the market. They also need to be more adaptive to the increasingly volatile socio-technical environment, and proactively search, exploit, upgrade, and integrate resources that are essential to the development of system development team flexibility.
Keywords :
System development project performance , External Social Capital , Information system development team flexibility
Journal title :
Information and Software Technology
Serial Year :
2011
Journal title :
Information and Software Technology
Record number :
2374686
Link To Document :
بازگشت