• Title of article

    Solving a fuzzy multi-objective products and time planning using hybrid meta-heuristic algorithm: Gas refinery case study

  • Author/Authors

    Rabbani، Masoud نويسنده , , Farrokhi-Asl ، Hamed نويسنده School of Industrial Engineering, Iran University of Science & Technology, Tehran, Iran , , Ameli ، Mostafa نويسنده School of Industrial Engineering, College of Engineering, University of Tehran, Tehran, Iran ,

  • Issue Information
    فصلنامه با شماره پیاپی 14 سال 2016
  • Pages
    14
  • From page
    93
  • To page
    106
  • Abstract
    Planning is one of the most important components of gas industry production. Most big gas companies usually look for effective planning approaches to accomplish the organizational objectives including cost and time reduction as well as enhancing quality and efficiency. For planning gas refinery production, important parameters including production time, production volume, production cost and storage need to be considered. Planning different units ought to be integrated and coordinated with other departments. This article presents an intensive arithmetic model to determine the production of gas derivatives. The proposed model of this paper is formulated as a mixed integer programming and the resulted problem is solved using NSGA-II algorithm and a hybrid method called BBO/NSGA-II. The problem is also applied for a real-world case study and the results are discussed.
  • Journal title
    Uncertain Supply Chain Management
  • Serial Year
    2016
  • Journal title
    Uncertain Supply Chain Management
  • Record number

    2385687