Title of article
ASSEMBLY PERFORMANCE OF A GASKETED BOLTED FLANGED PIPEJOINT USING DIFFERENT BOLT TIGHTENING STRATEGIES
Author/Authors
ABID، M نويسنده , , ABDUL WAJID، H نويسنده , , ABBAS، A نويسنده , , MEHMOOD، Y نويسنده ,
Issue Information
دوفصلنامه با شماره پیاپی M1 سال 2015
Pages
8
From page
253
To page
260
Abstract
This paper presents the results of the assembly process of a gasketed bolted flanged
pipe joint for two different bolt tightening strategies, i.e. ASME and Industrial using torque control
of preload method. The final clamping force is achieved in four and five passes in ASME and
Industrial strategy respectively. Axial bolt stress variation, at the end of each pass, individual bolt
bending behavior, gasket stress and flange stress variations for both strategies are discussed.
Keywords
Pipe flange joint , Finite Element Analysis , assembly process , Clamping force , torque control
Journal title
Iranian Journal of Science and Technology Transactions of Mechanical Engineering
Serial Year
2015
Journal title
Iranian Journal of Science and Technology Transactions of Mechanical Engineering
Record number
2402217
Link To Document