• Title of article

    Prioritizing Projects Using Hybrid Methods of Six Sigma, TRIZ and Gray ANP

  • Author/Authors

    Amini، A. نويسنده M.Sc., Department of industrial engineering, Alghadir institute of higher education, Tabriz Amini, A. , Alinezhad، A. نويسنده Associate Professor, Faculty of Industrial and Mechanical Engineering, Qazvin branch, Islamic Azad University, Qazvin Alinezhad, A.

  • Issue Information
    فصلنامه با شماره پیاپی 20 سال 2016
  • Pages
    18
  • From page
    1
  • To page
    18
  • Abstract
    Abstract In this study due to the increasing amount of quality problems that arise in organizations, some of these problems in Tehran municipality are being tested. First, a large number of projects that need to be improved are defined by one of multiple decision-making methods of MCDM named ANP priorities. Then, the most important projects have been selected. For doing this project, some problems arise that parts of their information are known and some are unknown. To identify and select the problems, gray systems are being used, and the main problem can be found by using "gray possible degree" that are the new decision-making techniques and evaluate mathematical data which are vague and uncertain. The identified problem is analysis by using the methodology of Six Sigma and DMAIC cycle. By using Pareto charts and Minitab software the main causes of the issues have been identified and resolved. Finally, by using creative and innovative techniques, the problem-solving capability of TRIZ is improved.
  • Journal title
    International Journal of Applied Operational Research
  • Serial Year
    2016
  • Journal title
    International Journal of Applied Operational Research
  • Record number

    2404903