Author/Authors :
Eydi Alireza نويسنده Faculty of Engineering - University of Kurdistan, Sanandaj , Farughi Hiva نويسنده Faculty of Engineering - University of Kurdistan, Sanandaj , Abdi Farid نويسنده Faculty of Industrial Engineering - University of Kurdistan, Sanandaj
Abstract :
Time, cost and quality are considered as the main components in managing each project. Previous studies have mainly focused on the timecost
trade-off problems. Recently quality is considered as the most important factor in project’s success, which is influenced by time
acceleration. That is the less time is spent, the more success is gained. In time-cost-quality trade-off problems, each activity can be done in
various execution modes and determination of these execution modes is seen as to minimize the project time and cost and maximize its
quality. In this paper, three integer programming models are provided and one of the main objectives is optimized in each model by
assigning the proper bound to other objectives. Following the non-dominated solutions obtained by solving models, and by means of hybrid
approach of Fuzzy AHP strategy and VIKOR method regarded as multi-criteria decision making methods, the best possible alternative
(from among non-dominated solutions) has been suggested.