Title of article :
Optimizing and Solving Project Scheduling Problem for Flexible Networks with Multiple Routes in Production Environments
Author/Authors :
Birjandi, Alireza Department of Industrial Engineering - South Tehran Branch, Islamic Azad University, Tehran, Iran , Mousavi, Meysam Department of Industrial Engineering - Faculty of Engineering - Shahed University, Tehran, Iran , Hajirezaie, Mahdi Department of Industrial Engineering - South Tehran Branch, Islamic Azad University, Tehran, Iran , Vahdani, Behnam Department of Industrial Engineering - Faculty of Industrial and Mechanical Engineering - Qazvin Branch, Islamic Azad University, Qazvin, Iran
Pages :
22
From page :
175
To page :
196
Abstract :
In production environments, multi-route Resource-Constrained Project Scheduling Problem (RCPSP) is more complex and consists of two types of flexible and fixed parts. The flexible parts comprise the semi-finished products and each part has multiple routes denoted independently with activities and predictive relationships. This research develops a new Mixed‐Integer Nonlinear Programming (MINLP) model to minimize the makespan. The proposed mathematical model identifies the optimal routes and, consequently, determines the optimal project network. Also, it allocates renewable resources to each production activity. Production sequencing of activities is optimized by the proposed model. A new hybrid approach by regarding GA and PSO in a binary solving space is introduced to handle two main sub-problems of RCPSP-MR in production environments, namely route selection and production scheduling. To evaluate the presented optimization model and algorithm, 60 test problems in various sizes are reported in detail.
Keywords :
Multiple routes , Meta-heuristic algorithm , Mathematical model , Production scheduling problem , Production projects , Flexible production networks
Journal title :
Astroparticle Physics
Serial Year :
2019
Record number :
2469113
Link To Document :
بازگشت