Title of article :
Project Scheduling Problem with Resource Constraints and Interruption of Activities Using Bees Algorithm
Author/Authors :
imannejad, rana Department of Industrial Engineering - Bandar-e-Anzali International Branch - Islamic Azad University, Bandar-e-Anzali, Iran , Avakh Darestani, soroush Department of Industrial Engineering - Faculty of Industrial and Mechanical Engineering - Qazvin Branch - Islamic Azad University, Qazvin, Iran
Abstract :
Project scheduling problem with resource constraints is a wellknown
problem in the field of project management. The applicability
of this problem created a tendency for researchers towards it. In this
study, project scheduling with resource constraints and the
possibility of interruption of project activities has been considered,
and renewable resource constraint has been also applied; in
addition, a case study on construction projects has been also
presented. Construction projects involve complex levels of work.
Making wrong decisions in selecting methods and in allocating the
necessary resources, such as manpower and equipment, can lead to
the results such as increasing the predetermined cost and time.
According to NP-Hard nature of the problem, it is very difficult or
even impossible to obtain optimal solution using optimization
software and traditional methods. In CPM project scheduling
method, critical path is widely used in order to schedule the problem;
however, in this method, the resource constraints are not considered.
Project Scheduling seeks proper sequence to perform the project
activities. This study has been conducted using Bees meta-heuristic
algorithm, with the aim of optimizing the project completion time.
Finally, the results obtained from three algorithms and GAMS
software reflect that this algorithm outperforms the others, provides
the best solution, and is able to reach the exact solution.
Keywords :
Planning , Project scheduling , Activities interruption , Bees algorithm , Resource constraint