Title of article :
OPTIMIZATION OF MULTI PERIOD - MULTI LOCATION CONSTRUCTION PROJECTS CONSIDERING RESOURCE POOL an‎d BATCH ORDERING
Author/Authors :
Rostami, M Department of Industrial Engineering - Iran University of Science and Technology, Tehran , Bagherpour, M Department of Industrial Engineering - Iran University of Science and Technology, Tehran
Pages :
21
From page :
107
To page :
127
Abstract :
During the past two decades, some industries have been moving towards project-centered systems in many modern countries. Therefore, managing simultaneous projects with considering the limitations in resources, equipment and manpower is very crucial. In the real world, project-based organizations are always facing with two main important features. First, the construction projects are decentralized and their distances are long, and second, there are several construction projects undertaken at different time periods. Therefore, appropriate selection of projects with regard to the capabilities of the organization may lead with increasing an expected profitability. This paper investigates the multi-period decentralized multi construction-project and scheduling problem subject to resource constraints, optimal resource pool location, deterioration and batch ordering of nonrenewable resources altogether, for the first time in the literature. In order to describe the problem under consideration in this paper and obtaining the optimal solutions, a mixed integer linear programming model is developed. Finally, the impact of decision integration on the profit profile of an organization is comprehensively investigated by solving numerical examples and through developing some heuristic methods.
Keywords :
project selection , construction scheduling , resource pool location , batch ordering , multi-period planning
Journal title :
Astroparticle Physics
Serial Year :
2019
Record number :
2490861
Link To Document :
بازگشت