• Title of article

    Solving Critical Path Problem in Project Network by a New Enhanced Multi-objective Optimization of Simple Ratio Analysis Approach with Interval Type-2 Fuzzy Sets

  • Author/Authors

    Dorfeshan, Y. Department of Industrial Engineering - Shahed University, Tehran , Mousavi, S. M. Department of Industrial Engineering - Shahed University, Tehran , Vahdani, B. Department of Industrial Engineering - Qazvin Branch, Islamic Azad University, Qazvin , Mohagheghi, V. Department of Industrial Engineering - Shahed University, Tehran

  • Pages
    10
  • From page
    1352
  • To page
    1361
  • Abstract
    Decision making is an important issue in business and project management that assists finding the optimal alternative from a number of feasible alternatives. Decision making requires adequate consideration of uncertainty in projects. In this paper, in order to address uncertainty of project environments, interval type-2 fuzzy sets (IT2FSs) are used. In other words, the rating of each alternative and weight of each criterion are expressed by IT2FSs. Moreover, for obtaining weights of criteria, interval type-2 fuzzy analytic hierarchy process (AHP) method is employed. In addition, a new enhanced model of multi-objective optimization on the basis of simple ratio analysis (MOOSRA) method is developed with IT2F-relative preference relation. Finally, to illustrate applicability of the introduced approach, an existing application from literature is adopted and solved.
  • Keywords
    Project Critical Path Problem , Relative Preference Relation , Interval Type-2 Fuzzy Sets , Multi-objective Optimization of Simple Ratio , Analysis Method
  • Journal title
    International Journal of Engineering
  • Serial Year
    2017
  • Record number

    2508113