• Title of article

    How to Target Balanced Scorecard Indicators in a DEA-BSC Integrated Model

  • Author/Authors

    Fallah, Mohammad Department of Industrial Engineering - Central Tehran Branch - Islamic Azad University, Tehran, Iran , Najafi, Esmaeil Islamic Azad University - Science and Research Branch

  • Pages
    9
  • From page
    1
  • To page
    9
  • Abstract
    Performance measurement is always one of the most important tasks of managers, so knowledge management is measurement knowledge, and if we can measure something, we can no doubt control it, and therefore we cannot manage it. In this paper, according to the Malmquist productivity index, an index is used to determine the progress and regress of a unit. This index is defined by the boundary changes resulting from the inputs of the units and their efficiency changes, which we call the Malmquist Productivity Index. After calculating the Malmquist changes, we were able to determine the rate of increase or decrease in the indicators for the following period.
  • Keywords
    Malmquist Productivity Index , Balanced Scorecard , Data Envelopment Analysis
  • Journal title
    IJO: Iranian Journal of Optimization
  • Serial Year
    2020
  • Record number

    2524177