Title of article :
An imperfect multi-item single-machine production system with shortage, rework, and scrap considering inspection, dissimilar deciency levels, and non-zero setup times
Author/Authors :
Nobil, A.H. Faculty of Industrial and Mechanical Engineering - Islamic Azad University Qazvin Branch, Iran , Afshar Sedigh, A.H. University of Otago, Dunedin, New Zealand , Tiwari, S. National University of Singapor , Wee, H.M. Department of Industrial and Systems Engineering - Chung Yuan Christian University, Taiwan
Abstract :
In this paper, we consider a decient production system with permissible
shortages. The production system consists in a unique machine that manufactures a number
of products with a part being imperfect in the form of rework or scrap. These defective
products are identied by 100% inspection during production; then, they are whether
reworked or disposed of after normal production process. Like real-world production
systems, there are diverse types of errors creating dissimilar breakdown severity and rework.
Moreover, rework has non-zero setup time, which makes the problem closer to real-world
instances, and the machines require some preparations before starting a new production cycle.
Thus, we introduce an Economic Production Quantity (EPQ) problem for an imperfect
manufacturing system with non-zero setup times for rework items. The rework items are
classied into several categories based on their types of failure and rework rates. The aim
of this study is to obtain optimum production time and shortage in each period minimizing
total inventory system costs. Convexity of the objective function and exact solution
procedure for the current nonlinear optimization problem are also proposed. Finally, a
numerical example is presented to assess eciency and validity of the proposed algorithm.
Keywords :
Lot sizing , Imperfect manufacturing , Multiple rework , Single machine , Exact algorithm
Journal title :
Scientia Iranica(Transactions E: Industrial Engineering)