Title of article
A new comprehensive project scheduling, monitoring, and management framework based on the critical chain under interval type-2 fuzzy uncertainty
Author/Authors
Aramesh, S. Department of Industrial Engineering - Faculty of Engineering, Shahed University, Tehran, Iran , Mousavi, S. M. Department of Industrial Engineering - Faculty of Engineering, Shahed University, Tehran, Iran , Mohagheghi, V. Department of Industrial Engineering - Faculty of Engineering, Shahed University, Tehran, Iran
Pages
20
From page
151
To page
170
Abstract
Projects require proper control and management techniques to achieve their defined success criteria. Often projects end in longer periods and higher costs than planned. It is necessary to apply approaches that can keep the project close to its predefined goals and purposes. In this paper, a new framework is presented that is mainly concerned with properly managing project implementation and evaluation. In detail, the method has four main parts. First, a new mathematical programming is offered to address project scheduling. The results of project scheduling are then applied in a critical chain method based approach under interval type-2 fuzzy uncertainty in the second part to both enhance project scheduling and address uncertainty. The third part of the approach is developed to monitor the project implementation process, and new thresholds are defined to discuss corrective measures when necessary. Finally, the fourth part of the approach is designed to evaluate project implementation and reach an understanding of how the project is implemented. To display the applicability of the approach, a practical example is solved, and the process is step by step presented along with the comparative analysis.
Keywords
Project scheduling , critical chain method , mathematical programming , project monitoring , resource constrained project scheduling , interval type-2 fuzzy sets
Journal title
Iranian Journal of Fuzzy Systems (IJFS)
Serial Year
2021
Record number
2526871
Link To Document