Title of article :
Robustness price of open-pit mine production scheduling
Author/Authors :
Alipour, Aref Department of Mining and Metallurgical - Urmia University of Technology, Iran , Khodaiari, Ali Asghar School of Mining Engineering - College of Engineering - University of Tehran - Tehran, Iran , Jafari, Ahmad School of Mining Engineering - College of Engineering - University of Tehran - Tehran, Iran , Tavakkoli-Moghaddam, Reza Arts et Métiers ParisTech - LCFC - Metz, France
Pages :
6
From page :
117
To page :
122
Abstract :
An Open-Pit Production Scheduling (OPPS) problem focuses on specifying block production scheduling to achieve the highest possible Net Present Value (NPV). This paper presents a new mathematical model for OPPS under uncertainty. To this end, a robust box and ellipsoidal counterpart approach was used. The proposed method was implemented in a hypothetical model. A Genetic Algorithm (GA) and an exact mathematical modeling approach were used to solve the model. It was shown that the scheduling of deterministic and robust models in various conditions is different. Considering the type of robust counterparts, different production plans under various conditions were scheduled. Furthermore, the price of robustness was determined for various levels of conservation.
Keywords :
Uncertainty , Robust counterpart , Production scheduling , Open-pit
Journal title :
International Journal of Mining and Geo-Engineering
Serial Year :
2020
Record number :
2527041
Link To Document :
بازگشت