• Title of article

    Multi-objective sequence dependent setup times hybrid flowshop scheduling: A literature review

  • Author/Authors

    Ghassemi Tari ، F. Department of Industrial Engineering - Sharif University of Technology , Rezapour Niari ، M. Department of Industrial Engineering - Sharif University of Technology

  • From page
    254
  • To page
    306
  • Abstract
    Multi-criteria sequence dependent setup times scheduling problems exist almost everywhere in real modern manufacturing world environments. Among them, Sequence Dependent Setup Times-Multi-Objective Hybrid Flowshop Scheduling Problem (SDST-MOHFSP) has been an intensifying attention of researchers and practitioners in the last three decades. In this paper, we briefly summarized and classified the current standing of SDST-MOHFSP. All publications are categorized regarding the solution methods, as well as the structure of the hybrid flowshop which helps researcher and practitioner to use/modify proper solution algorithm for solving their specific problem. Furthermore, based on the review of the existing papers, the need for future research is recognized. Accordingly, by recognizing the research gaps, a large number of recommendations for further study have been proposed.
  • Keywords
    Multi , objective algorithms , hybrid flowshop scheduling , Sequence Dependent Setup Times , exact methods , heuristic and metaheuristic algorithms , Literature Review
  • Journal title
    International Journal of Research in Industrial Engineering
  • Journal title
    International Journal of Research in Industrial Engineering
  • Record number

    2544279