Title of article :
Coordinated Operation of Wind Farms, Cascaded Hydro, Photo-voltaic, and Pump-storage Considering WT-ANN-ICA Hybrid Prediction Method
Abstract :
In this paper, a new algorithm is presented to reduce the uncertainty effects of wind farms power generation (WFPG) and
photo-voltaic generation (PVG) in both day-ahead energy and ancillary services markets. Firstly, this research tries to
predict the uncertainty of short-term WFPG with acceptable accuracy. Indeed, it uses the hybrid method of wavelet transform
(WT) in order to reduce the fluctuations in the input historical data along with the improved artificial neural network (ANN)
based on the nonlinear structure for better training and learning. Furthermore, the imperialist competitive algorithm (ICA)
is adopted to find the best weights and biases for minimizing the mean square error of predictions.
In addition, regarding the high-level penetration of wind farms (WFs) on the power system, cascaded hydro units (CHUs)
and pump-storage units (PSUs) are taken for the first time as supplementary units. Therefore, they are coordinated with WFs
and photo-voltaic (PV) operations. Considering uncertainties of energy price, spinning and non-spinning reserves in the
electricity market, WFPG, PVG and the availability of WFs, PV, CHUs and PSUs along with their effects on energy supply
reliability lead to a scenario-based stochastic optimization problem. The aim of this problem is to increase the profit and
decrease the financial risk (FR) of all of the units. The proposed method is implemented on WFs, PV, CHUs and PSUs of
IEEE 118-bus standard system. Studying the results of profit and FR in the coordinated operation (CO) and the independent
operation (IO) confirms that the profit is increased and the FR is reduced in the CO. Hence, the ability and merit of hybrid
method of WT-ANN-ICA is verified.
Keywords :
Availability , Cascaded hydro units , Photo-voltaic , Pump-storage units , Wind farms