    Case Study in Increasing Overall Equipment Effectiveness on Progressive Press Machine Using Plan-do-check-act Cycle

  • Author/Authors

    Jaqin, C. Industrial Engineering Program - Mercu Buana University, Jakarta, Indonesia , Rozak, A. Industrial Engineering Program - Mercu Buana University, Jakarta, Indonesia , Hardi Purba, H. Industrial Engineering Program - Mercu Buana University, Jakarta, Indonesia

  • Pages
    7
  • From page
    2245
  • To page
    2251
  • Abstract
    Press automotive components manufacturer in Indonesia with the Overall Equipment Effectiveness (OEE) achievement was 60.7%, it was below than world company level as mention in Japanese Institute of Plant Maintenance (JIPM)- Total Productive Maintenance (TPM) standard, the biggest OEE components problem was availability value that achieved 63.3%, then the biggest availability problem was dies preparation time. Using TPM method and Plan-Do-Check-Act (PDCA) cycle with Pareto chart and Fishbone diagram, we succeeded to improve dies setting time within one months. We could increase the availability value from 63.3% became 67.8% and finally OEE value increased from 60.7% became 65.3%
  • Keywords
    Total Productive Maintenance , Availability , Overall Equipment Effectiveness , Plan-do-check-act Cycle
  • Journal title
    International Journal of Engineering
  • Serial Year
    2020
  • Record number

    2557294