Title of article
A UNIFIED MODEL FOR RESOURCE-CONSTRAINED PROJECT SCHEDULING PROBLEM WITH UNCERTAIN ACTIVITY DURATIONS
Author/Authors
Csébfalvi, A. University of Pécs - Department of Structural Engineering, Hungary
From page
341
To page
355
Abstract
In this paper we present a unified (probabilistic/possibilistic) model for resource-constrained project scheduling problem (RCPSP) with uncertain activity durations and a concept of a heuristic approach connected to the theoretical model. It is shown that the uncertainty management can be built into any heuristic algorithm developed to solve RCPSP with deterministic activity durations. The essence and viability of our unified model are illustrated by fuzzy examples presented in the recent fuzzy RCPSP literature.
Keywords
project scheduling , stochastic scheduling , fuzzy scheduling , resourceconstrained project , heuristic algorithm , simulation , central limit theorem , frequency histogram , density function , membership function
Journal title
International Journal of Optimization in Civil Engineering
Journal title
International Journal of Optimization in Civil Engineering
Record number
2566540
Link To Document