• Title of article

    A UNIFIED MODEL FOR RESOURCE-CONSTRAINED PROJECT SCHEDULING PROBLEM WITH UNCERTAIN ACTIVITY DURATIONS

  • Author/Authors

    Csébfalvi, A. University of Pécs - Department of Structural Engineering, Hungary

  • From page
    341
  • To page
    355
  • Abstract
    In this paper we present a unified (probabilistic/possibilistic) model for resource-constrained project scheduling problem (RCPSP) with uncertain activity durations and a concept of a heuristic approach connected to the theoretical model. It is shown that the uncertainty management can be built into any heuristic algorithm developed to solve RCPSP with deterministic activity durations. The essence and viability of our unified model are illustrated by fuzzy examples presented in the recent fuzzy RCPSP literature.
  • Keywords
    project scheduling , stochastic scheduling , fuzzy scheduling , resourceconstrained project , heuristic algorithm , simulation , central limit theorem , frequency histogram , density function , membership function
  • Journal title
    International Journal of Optimization in Civil Engineering
  • Journal title
    International Journal of Optimization in Civil Engineering
  • Record number

    2566540