Title of article :
TOWER CRANES AND SUPPLY POINTS LOCATING PROBLEM USING CBO, ECBO, AND VPS
Author/Authors :
kaveh, a. iran university of science and technology - centre of excellence for fundamental studies in structural engineering, ايران , vazirinia, y. iran university of science and technology - centre of excellence for fundamental studies in structural engineering, ايران
Abstract :
Tower cranes are major and expensive equipment that are extensively used at building construction projects and harbors for lifting heavy objects to demand points. The tower crane locating problem to position a tower crane and supply points in a building construction site for supplying all requests in minimum time, has been raised from more than twenty years ago. This problem has already been solved by linear programming, but meta-heuristic methods spend less time to solving the problem. Hence, in this paper three newly developed meta-heuristic algorithms called CBO, ECBO, and VPS have been used to solve the tower crane locating problem. Three scenarios are studied to show the applicability and performance of these meta-heuristics.
Keywords :
tower crane locating problem , colliding bodies optimization , vibrating particle system , construction site layout planning , project planning and design
Journal title :
International Journal of Optimization in Civil Engineering