Title of article :
COMPETITIVE DISTRIBUTION SYSTEM PLANNING MODEL INTEGRATION OF DG, INTERRUPTIBLE LOAD AND VOLTAGE REGULATOR DEVICES
Author/Authors :
SIAHI, M. islamic azad university, ايران , PORKAR, S. sharif university of technology - Dept of Electrical Engineering, تهران, ايران , PORKAR, S. islamic azad university, ايران , ABBASPOUR-TEHRANI-FARD, A. sharif university of technology - Dept of Electrical Engineering, تهران, ايران , POURE, P. Université Henri Poincaré de Nancy I - Laboratoire d’Instrumentation Electronique de Nancy, LIEN, France , SAADATE, S. Université Henri Poincaré deNancy I - Groupe de Recherches en Electrotechnique et Electronique de Nancy, GREEN-UHP, France
From page :
619
To page :
635
Abstract :
Distribution systems management is becoming an increasingly complicated issue due to the introduction of new technologies, new energy trading strategies, and new deregulated environment. In the new deregulated energy market and considering the incentives coming from the technical and economical fields, it is reasonable to consider Distributed Generation (DG) as a viable option to solve the lacking electric power supply problem. This paper presents a mathematical distribution system planning model considering three planning options to system expansion and to meet the load growth requirements with a reasonable price as well as the system power quality problems. DG is introduced as an attractive planning option in competition with voltage regulator devices and Interruptible load. In the mathematical model, the objective function includes investment costs, which are evaluated as annualized total cost, plus the total running cost as well as the cost of curtailed loads and losses. This model identifies the optimal type, size, and location of the planning options. This paper also studies the fluctuation of the load and electricity market price versus time period, and the effect of DG placement on system improvement. To solve the proposed mathematical planning model a new software package by interfacing MATLAB and GAMS is developed. This package enables one to solve large extent distribution system planning program visually and very fast. The proposed methodology is tested on the case of the well-known IEEE 30-bus test system.
Keywords :
Deregulation , distributed generation (DG) , distribution company (DISCO) , GAMS , MATLAB interface , interruptible load (IL) , optimization
Journal title :
Iranian Journal of Science and Technology :Transactions of Electrical Engineering
Journal title :
Iranian Journal of Science and Technology :Transactions of Electrical Engineering
Record number :
2596326
Link To Document :
بازگشت