Title of article
Estimating Electricity Generation from Wind Power by V82 at ThiQar – Iraq
Author/Authors
shaban, auday h. university of baghdad - college of education for pure science ibn-alhaitham - department of physics, Iraq
From page
60
To page
69
Abstract
One of the most demanded studies is wind turbine site assessment. It is difficult to build asimulation program because of the many variables that affect the wind speed and direction.The procedure of this research depend on two approaches, the Wind Atlas Analysis model andthe Inverse Distance Wait interpolation. These procedures give the estimated annual energyproduction for each turbine (V82) with 82m blades diameter at 70m hub heights. The outputat this location for each turbine is about (4.3 GWh). The studied area is about 20x20km2 andcould be plant at least 600 turbine and have about 2500 GWh of annual energy production
Keywords
wind power , WAsP , GIS
Journal title
Ibn Alhaitham Journal For Pure and Applied Science
Journal title
Ibn Alhaitham Journal For Pure and Applied Science
Record number
2602662
Link To Document