Title of article :
Proposing a lower bound for a nonlinear scheduling problem in supply chain
Author/Authors :
Beheshtinia, Mohamad Ali Department of Industrial Engineering - Faculty of Materials and Industrial Engineering - Semnan University, Semnan , Ghasemi, Amir Department of Industrial Engineering - Faculty of Materials and Industrial Engineering - Semnan University, Semnan, Iran
Pages :
13
From page :
1073
To page :
1085
Abstract :
This paper proposes a nonlinear programming model for a scheduling problem in the supply chain. Due to the nonlinear structure of the developed model and its NP-hard structure, a lower bound is developed. Four lemmas and a theorem are presented and proved to determine the lower bound. The proposed problem is inspired from a three stage supply chain commonly used in various industries.
Keywords :
scheduling , supply chain , lower bound , nonlinear programming
Journal title :
International Journal of Nonlinear Analysis and Applications
Serial Year :
2021
Record number :
2607781
Link To Document :
بازگشت