Author/Authors :
Rezaeian, J. Department of Industrial Engineering - Mazandaran University of Science and Technology, Babol, Iran. , Derakhshan, N. Department of Industrial Engineering - Mazandaran University of Science and Technology, Babol, Iran. , Mahdavi, I. Department of Industrial Engineering - Mazandaran University of Science and Technology, Babol, Iran , Alizadeh Foroutan, R. Department of Industrial Engineering - Mazandaran University of Science and Technology, Babol, Iran
Abstract :
In this paper, just-in-time scheduling problem with batch delivery and due date assignment for hybrid flow shop robotic cells is considered. A mixed integer linear programming (MILP) model is presented to determine the sequence of jobs and robot moves. Two meta-heuristic algorithms including Artificial Immune System (AIS) and Tabu Search (TS) are proposed. The results show that AIS performs well for this problem.
Keywords :
JIT scheduling , Robotic cells , Multiple robots , Batch delivery , Due date assignment