Title of article
Mathematical models and an elephant herding optimization for multiprocessor-task exible ow shop scheduling problems in the Manufacturing Resource Planning (MRPII) system
Author/Authors
Gholamia, H.R. Faculty of Industrial and Mechanical Engineering - Islamic Azad University Qazvin Branch, Qazvin, Iran , Mehdizadeh, E. Faculty of Industrial and Mechanical Engineering - Islamic Azad University Qazvin Branch, Qazvin, Iran , Naderi, B. Department of Industrial Engineering - Faculty of Engineering -Kharazmi University, Tehran, Iran
Pages
10
From page
1562
To page
1571
Abstract
Shop Floor Control (SFC) is one of the main concepts in Manufacturing
Resource Planning (MRPII), and production scheduling is a key element in SFC. This
paper studies the hybrid
ow shop scheduling problem, where jobs are multiprocessors.
The objective is to minimize total completion time. Although there are several papers
considering the hybrid
ow-shop scheduling problem with multiprocessor tasks, none has
proposed a mathematical model for this problem. At rst, the two problems (xed
and selective cases) are mathematically formulated by mixed integer linear programming
models. By using commercial software, the model is used to solve the small instances of the
problems. Moreover, an elephant herding optimization is developed to solve large instances
of the problems. To numerically evaluate the proposed algorithm, it is compared with three
available algorithms in the literature.
Keywords
Hybrid ow shop , Multiprocessor jobs , Mathematical modeling , Elephant herding optimization , Manufacturing Resource Planning (MRPII)
Journal title
Scientia Iranica(Transactions E: Industrial Engineering)
Serial Year
2020
Record number
2629152
Link To Document