• Title of article

    Mathematical models and an elephant herding optimization for multiprocessor-task exible ow shop scheduling problems in the Manufacturing Resource Planning (MRPII) system

  • Author/Authors

    Gholamia, H.R. Faculty of Industrial and Mechanical Engineering - Islamic Azad University Qazvin Branch, Qazvin, Iran , Mehdizadeh, E. Faculty of Industrial and Mechanical Engineering - Islamic Azad University Qazvin Branch, Qazvin, Iran , Naderi, B. Department of Industrial Engineering - Faculty of Engineering -Kharazmi University, Tehran, Iran

  • Pages
    10
  • From page
    1562
  • To page
    1571
  • Abstract
    Shop Floor Control (SFC) is one of the main concepts in Manufacturing Resource Planning (MRPII), and production scheduling is a key element in SFC. This paper studies the hybrid ow shop scheduling problem, where jobs are multiprocessors. The objective is to minimize total completion time. Although there are several papers considering the hybrid ow-shop scheduling problem with multiprocessor tasks, none has proposed a mathematical model for this problem. At rst, the two problems (xed and selective cases) are mathematically formulated by mixed integer linear programming models. By using commercial software, the model is used to solve the small instances of the problems. Moreover, an elephant herding optimization is developed to solve large instances of the problems. To numerically evaluate the proposed algorithm, it is compared with three available algorithms in the literature.
  • Keywords
    Hybrid ow shop , Multiprocessor jobs , Mathematical modeling , Elephant herding optimization , Manufacturing Resource Planning (MRPII)
  • Journal title
    Scientia Iranica(Transactions E: Industrial Engineering)
  • Serial Year
    2020
  • Record number

    2629152