Title of article :
Flow shop scheduling under Time-Of-Use electricity tariffs using fuzzy multi-objective linear programming approach
Author/Authors :
Badri, Amin Department of Industrial Engineering - Faculty of Technology and Engineering - East of Guilan - University of Guilan, Rudsar-Vajargah, Iran , Daghbandan, Allahyar Department of Chemical Engineering - Faculty of Engineering - University of Guilan, Rasht, Iran , Aghabeiginiyay Fatalaki, Zahra Department of Industrial Engineering - Kooshyar higher education institute, Rasht, Iran , Mirzazadeh, Mohammad Department of Engineering Sciences, Faculty of Technology and Engineering - East of Guilan - University of Guilan - Rudsar-Vajargah, Iran
Pages :
13
From page :
215
To page :
227
Abstract :
Given the reduction of non-renewable energy resources and increase of energy costs during recent years, developing an efficient scheduling model considering energy consumption is necessary in manufacturing systems. This paper is dedicated to flow shop scheduling problem under Time-Of-Use electricity tariffs. In this regard, a bi-objective mixed-integer programming model is formulated for the problem. Two objectives, namely, the minimization of the total electricity cost and the sum of earliness and tardiness of jobs, are considered simultaneously. The bi-objective model is converted into an equivalent single objective linear programming model using fuzzy multi-objective programming approach. The CPLEX solver in GAMS software is used to solve the proposed model for an instance. The numerical example shows that the proposed model is reasonable and applicable.
Keywords :
mixed-integer programming , bi-objective model , electricity price , earliness , tardiness
Journal title :
Journal of Mathematical Modeling(JMM)
Serial Year :
2021
Record number :
2688056
Link To Document :
بازگشت