Title of article :
First shale gas experience in Saudi Arabia - lessons learned
Author/Authors :
ALEXEYENKO, A. V. Saudi Aramco, Saudi Arabia , BARTKO, K. M. Saudi Aramco, Saudi Arabia , ADEBIYI I., A. Saudi Aramco, Saudi Arabia , FARAJ, O. A. Saudi Aramco, Saudi Arabia , CAMPO, C. Halliburton, USA
Abstract :
Influenced by the success of shale gas production worldwide and to meet requirements for clean energy supply, a multidisciplinary team of petroleum specialists was established in Saudi Aramco. Meeting the growing requirement in industrial consumption and especially electricity production is a driving force for developing unconventional gas reserves. The initial focus is in the northwest and in the area of Ghawar, where gas infrastructure exists. The company is innovatively combining knowledge and research to maximize gas reserves and production from conventional and unconventional resources in order to meet growing domestic demand (Saudi Aramco. 2010). During years 2010 - 2011 major international petroleum industry players - Schlumberger, Halliburton and Baker Hughes - were invited to share their experience in a series of workshops held in Dhahran. Exchange of expert ideas developed into appreciation of complexity of the shale gas reservoir and helped to identify the scope of work for the first Silurian Qusaiba shale gas well. The SHALE-1 well was drilled in 2007 as a gas exploration well. Recent drilling and geophysical data obtained in the well were beneficial for detailed sidetrack and fracture stimulation design. The Multidisciplinary task group was established and positioned in Dhahran. The draft work plan was developed 8 months before actual operations commenced on the well site. Thorough examination of the draft work plan progressed to the final work plan with a number of improvements. The Frac Stimulation design was fine-tuned, involving expertise from Saudi Aramco and Halliburton. The Complete Well on Paper exercise involved over 25 specialists from both companies and helped to rectify remaining completion/stimulation design issues, and put everyone on the same page in terms of the work program. Well site operations commenced in May 2011. All targets set for the SHALE-1 well were successfully achieved and the well was suspended for future utilization as an observation well.
Keywords :
Shale gas , unconventional drilling , hydraulic fracturing.
Journal title :
Journal Of Engineering Research
Journal title :
Journal Of Engineering Research