Title of article
Multi-Objective Fuzzy Modeling of Project Scheduling with Limitations of Multi-Skilled Resources Able to Change Skill Levels and Interrupt Activities
Author/Authors
Salehi, Mojtaba Department of Industrial Engineering - payamenoor university - Tehran, Iran , Jabarpour, Efat Department of Industrial Management - Tehran University - Tehran, Iran
Pages
16
From page
1
To page
16
Abstract
Project scheduling is one of the most important and applicable concepts of project management.
Many project-oriented companies and organizations apply variable cost reduction strategies in
project implementation. Considering the current business environments, in addition to lowering
their costs, many companies seek to prevent project delays. This paper presents a multi-objective
fuzzy mathematical model for the problem of project scheduling with the limitation of multi-skilled
resources able to change skills levels, optimizing project scheduling policy and skills recruitment.
Given the multi objectivity of the model, the goal programming approach was used, and an
equivalent single-objective model was obtained. Since the multi-skilled project scheduling is
among the NP-Hard problems and the proposed problem is its extended state, so it is also an NPHard
problem. Therefore, NSGA II and MOCS meta-heuristic algorithms were used to solve the
large-sized model proposed using MATLAB software. The results show that the multi-objective
genetic algorithm performs better than the multi-objective Cuckoo Search in the criteria of goal
solution distance, spacing, and maximum performance enhancement.
Keywords
Multi-objective cuckoo search , Project scheduling , Multi skilled resources , Goal programming , Multi-objective genetic algorithm
Journal title
International Journal of Industrial Engineering and Production Research
Serial Year
2021
Record number
2698920
Link To Document