Title of article :
The Interval Type-2 Fuzzy ELECTRE III Method to Prioritize Machines for Preventive Maintenance
Author/Authors :
Mohamadghasemi, Amir Department of Management - Zabol Branch - Islamic Azad University - Zabol, Iran , Hadi-Vencheh, Abdollah Department of Mathematics - Isfahan (Khorasgan) Branch - Islamic Azad University - Isfahan, Iran , Hosseinzadeh Lotfi, Farhad Department of Mathematics - Science and Research Branch - Islamic Azad University - Tehran, Iran
Abstract :
Preventive maintenance (PM) of machines and equipment plays the critical role in a factory or an
organization. It can decrease the number of failures, increase reliability, and minimize total costs of
production systems. The duty of maintenance section managers is to prioritize machines and then,
implement PM programs for them. Since machines have different measures with respect to the
maintenance costs, reliability, mean time between failures (MTBF), availability of spare parts, etc., the
machines evaluation problem can be considered as a multiple criteria decision-making (MCDM)
problem. Accordingly, the MCDM techniques can be applied to solve them. This paper is aimed at
extending a version of the ELimination Et Choix Traduisant la REalité (ELECTRE III) method to
interval type-2 fuzzy sets (IT2FSs) where curved membership functions (MFs) are applied. The
extended ELECTRE III methodology is then utilized to a maintenance group MCDM (GMCDM) matrix
including the quantitative (QNC) and qualitative criteria (QLC). In the proposed approach, the
criteria weights, the assessment of alternatives with respect to criteria, and the thresholds are stated
with Gaussian interval type-2 fuzzy sets (GIT2FSs). In order to show the effectiveness and applicability
of the proposed approach, a case study and an illustrative example are exhibited using real decisionmaking
problems. Due to the high correlation coefficients among our method and the others, it can be
considered as a valid and reliable approach to prioritize machines for PM.
Keywords :
Preventive maintenance , ELECTRE III , Gaussian interval type-2 fuzzy sets , Alpha cuts
Journal title :
International Journal of Industrial Engineering and Production Research