Title of article
Monitoring binary response profiles in multistage processes
Author/Authors
Derakhshani, Reza Department of Industrial Engineering - Faculty of Engineering - North Tehran Branch - Islamic Azad University, Tehran , Esmaeeli, Hamid Department of Industrial Engineering - Faculty of Engineering - North Tehran Branch - Islamic Azad University, Tehran , Amiri, Amirhossein Department of Industrial Engineering - Faculty of Engineering - Shahed University
Pages
18
From page
97
To page
114
Abstract
Monitoring Binomial regression profiles in Phase II is examined in this study for multistage
manufacturing processes where the quality characteristic is binary. In these kinds of processes, the quality of
the final product depends on the quality characteristic of the previous stages, which is referred to as the
cascade property. The U statistic was used to diminish the effect of this property. Then, four approaches, such
as T2 and MEWMA control chart, LRT, and LRT/EWMA method, have been used, and the performance of
these methods have been evaluated using simulation and a numerical example by means of ARL. An actual
case study was also used to investigate the effectiveness of monitoring methods in further depth. Studies
reveal that the proposed schemes perform well.
Keywords
Binomial regression profile , Cause selecting control charts , Cascade Property , Multistage Processes , Profile Monitoring
Journal title
Journal of Quality Engineering and Production Optimization
Serial Year
2021
Record number
2704388
Link To Document