Developing Road Infrastructure Route Planning:Increasing Feasibility of Toll Road Project
Author/Authors :
berawi, mohammed ali universitas indonesia - faculty of engineering - department of civil engineering, Indonesia , zagloel, teuku yuri universitas indonesia - faculty of engineering - department of civil engineering, Indonesia , miraj, perdana universitas indonesia - faculty of engineering - department of civil engineering, Indonesia , miraj, perdana universitas pancasila - faculty of engineering - department of civil engineering, Indonesia , berawi, abdurrohim boy universitas indonesia - faculty of engineering - department of civil engineering, Indonesia , titaheluw, wellsi universitas indonesia - faculty of engineering - department of civil engineering, Indonesia , bin abd karim, saipol bari university of malaya - faculty of built environment building - department of quantity surveying, Malaysia
From page :
147
To page :
152
Abstract :
Indonesian government attempts to improve connectivity and to increase regional activities in Sumatera Island through the development of Trans Sumatera Toll Road (TSTR). However, despite its benefits to local economic development in Sumatera, the project shows low feasibility due to a low amount of investment. It can be attributed from the lack of planning in the initial phase to produce a comprehensive route that considers the various potentials of the regions. Thus, this research aims to investigate alternative route planning of Trans Sumatera Toll Road particularly in this paper for Central Sumatera by studying Gross Regional Domestic Product (GRDP), population and other significant factors. This research exposes cities and districts in Riau, West Sumatera, and Jambi which potentially contribute to the regional economy. Each selected towns and districts will be integrated with the intermodal system and connected to other functions to establish the Trans Sumatera Toll Road project in Central Sumatera. Compared to existing estimation of investment from public records, this alternative route has generated a competitive cost of investment which is estimated around 118,053,400,074,696 rupiahs. The research findings are expected to become the basis to improve other similar infrastructure toll road project development.
Keywords :
case study , feasibility , Indonesia route planning , toll road
Journal title :
Makara Journal Of Technology
Journal title :
Makara Journal Of Technology
Record number :
2717677
Link To Document :
بازگشت