• Title of article

    A simple solution procedure for solving the multi-delivery policy into economic production lot size problem with partial rework

  • Author/Authors

    chung, k.-j. chung yuan christian university - college of business, Taiwan , chung, k.-j. national taiwan university of science and technology, Taiwan , chung, k.-j. shih chien university - department of international business management, Taiwan , ting, p.-sh. shih chien university - department of international business management, Taiwan , cardenas-barron, l.e. tecnologico de monterrey - school of engineering and sciences, Mexico

  • From page
    2640
  • To page
    2644
  • Abstract
    Recently, an alternative multi-delivery policy into imperfect economic production quantity (EPQ) inventory model with partial rework has been proposed, which considers the number of shipments a fixed and given value. This paper, treating the long-run average costs per unit time as a function of the replenishment lot size and the number of shipments , adopts the differential calculus approach to get the optimal solution of and jointly. In numerical examples, it is illustrated that the solution procedure is simple and accurate.
  • Keywords
    Replenishment lot size , multiple shipments , manufacturing , rework , scrap , Inventory
  • Journal title
    Scientia Iranica(Transactions E: Industrial Engineering)
  • Journal title
    Scientia Iranica(Transactions E: Industrial Engineering)
  • Record number

    2720461