Title of article
Oil Withdrawal Technological Advancement for Multilayer Field
Author/Authors
Gusmanova, Aigul Yessenov University, Aktau, KAZAKHSTAN , Bekbayeva, Raushan Yessenov University, Aktau, KAZAKHSTAN , Koyshieva, Aigerim Yessenov University, Aktau, KAZAKHSTAN , Koyshiev, Abylai Yessenov University, Aktau, KAZAKHSTAN
Pages
12
From page
521
To page
532
Abstract
The authors discuss the technology for dual pumping technology of oil-producing wells and show its advantages and shortages. It is concluded that the simultaneous-separate oil production project proposed is economically attractive due to increment in oil production, high-income terms, and short pay-off period even in small and depleted reservoirs. Furthermore, the potential of the proposed project is evaluated in terms of the required facilities and incremental oil production. Dual pumping technology becomes of ever-more use today since the unified well-spacing pattern envisioned for multilayer field development and operation ensures the feasibility of multiple-zone production, and, as a consequence, ramp-up of reserves recovery and oil drainage amount as well. At the same time, the practicability of multiple-zone production depends on a number of fraught factors and requires thereof appropriate inventory and current status analyses to be fulfilled with regard to reserves recovery operations. As influx performance study and fluid-bearing characteristics of reservoirs are often incomplete due to field situation, the authors, therefore, follow the task to carry out an efficient analysis of multi-zone productions based on dual completion technologies.
Farsi abstract
فاقد چكيده فارسي
Keywords
Dual completion wells , Geologic characteristics , Multilayer fields , Reservoir performance
Journal title
Iranian Journal of Chemistry and Chemical Engineering (IJCCE)
Serial Year
2022
Record number
2721544
Link To Document