• Title of article

    Developing a model for time-cost trade-off optimization problem considering overdraft issue in uncertain environments

  • Author/Authors

    Mohammadi Atashgah ، Kayvan Department of Civil Engineering - Islamic Azad University, Qazvin Branch , Ghousi ، Rouzbeh School of Industrial Engineering - Iran University of Science and Technology , Monir Abbasi ، Armin Faculty of Civil Engineering - Payame Noor University , Tayefi Nasrabadi ، Abbasali Department of Civil Engineering - Islamic Azad University, Qazvin Branch

  • From page
    259
  • To page
    279
  • Abstract
    In project management, the time–cost problem plays a key role in planning and development. However, this problem is coped with the uncertainties resulted from an integral component of project cost and duration estimates. Often techniques are disable to formulate such uncertainty. Therefore, it is necessary to deveop a model that can take into account the uncertainty imposed by projects. To achieving the aim, Monte Carlo simulation technique is employed to analize the uncertainties arisen from the project cost and time estimations. To offer a trade-off between project time and cost, an optimization technique based on the Gray Wolf Optimization algorithm is used. The next, a overdraft analysis is conducted to operationally investigate the contract for future finance. The proposed framework is capable of solving a time-cost problem while the uncertainty is associated with project cost and time. The results show that the developed model generates a more reliable and accurate result and diminishes the risks connected to projects.
  • Keywords
    Time–cost problem , Monte Carlo simulation , Gray wolf optimization , trade , off analysis
  • Journal title
    Journal of Industrial and Systems Engineering (JISE)
  • Journal title
    Journal of Industrial and Systems Engineering (JISE)
  • Record number

    2736867