• Title of article

    Developing a new fuzzy approach for solving two-machine flow shop scheduling problems under fuzziness

  • Author/Authors

    Khalifa ، Hamiden Abd El-Wahed Department of Mathematics - College of Science and Arts - Qassim University

  • From page
    195
  • To page
    204
  • Abstract
    The current study investigates a two-machine Flow Shop Scheduling (FSS) problem with piecewise quadratic fuzzy processing time. It is illogical to consider that the processing time is exact but uncertain because it varies due to human factors. One of the most popular approximate intervals, namely, close interval approximation for the Piecewise Quadratic Fuzzy Number (PQFN), is introduced. A solution method with the help of Johnson’s algorithm, the close interval approximation of PQFNs, and the modified McCahon and Lee’s algorithm is developed to determine the minimization of the expected makespan. Numerical experimentation is performed to demonstrate the effectiveness of the suggested methodology.
  • Keywords
    Optimization problems , Production scheduling , Two , machine flow shops problem , Piecewise quadratic fuzzynumbers , Decision making , Close interval approximation , Expected makespan , Optimal sequence
  • Journal title
    Computational Algorithms and Numerical Dimensions (CAND)
  • Journal title
    Computational Algorithms and Numerical Dimensions (CAND)
  • Record number

    2779456