Title of article :
Optimum Discharge Burnup and Cycle Length for PWRs
Author/Authors :
Ivanov، Kostadin N. نويسنده , , Yilmaz، Serkan نويسنده , , Secker، Jeffrey R. نويسنده , , Johansen، Baard J. نويسنده , , Stucker، David L. نويسنده , , Ozer، Odelli نويسنده , , Young، E. H. نويسنده ,
Issue Information :
روزنامه با شماره پیاپی سال 2005
Pages :
-108
From page :
109
To page :
0
Abstract :
This paper discusses the results of a pressurized water reactor fuel management study determining the optimum discharge burnup and cycle length. A comprehensive study was performed considering 12-, 18-, and 24-month fuel cycles over a wide range of discharge burnups. A neutronic study was performed followed by an economic evaluation. The first phase of the study limited the fuel enrichments used in the study to <5 wt% 235U consistent with constraints today. The second phase extended the range of discharge burnups for 18-month cycles by using fuel enriched in excess of 5 wt%. The neutronic study used state-of-the-art reactor physics methods to accurately determine enrichment requirements. Energy requirements were consistent with todayʹs high capacity factors (>98%) and short (15-day) refueling outages. The economic evaluation method considers various component costs including uranium, conversion, enrichment, fabrication and spent-fuel storage costs as well as the effect of discounting of the revenue stream. The resulting fuel cycle costs as a function of cycle length and discharge burnup are presented and discussed. Fuel costs decline with increasing discharge burnup for all cycle lengths up to the maximum discharge burnup considered. The choice of optimum cycle length depends on assumptions for outage costs.
Keywords :
Power-aware
Journal title :
NUCLEAR TECHNOLOGY
Serial Year :
2005
Journal title :
NUCLEAR TECHNOLOGY
Record number :
29990
Link To Document :
بازگشت