Title of article
Grouting of external tendons-a practical perspective
Author/Authors
Smith، L. J. نويسنده , , Wood، R. نويسنده ,
Issue Information
روزنامه با شماره پیاپی سال 2001
Pages
-92
From page
93
To page
0
Abstract
This paper surnmarises the extensive grouting operation on a 1.7 km long externally post-tensioned precast segmental viaduct, part of the recently opened phase of improvements to the A13 trunk road in Dagenham. The authorsʹ intention is to provide practical feedback to the industry on specific items such as air testing, ducting and grouting as well as linking this to the Concrete Societyʹs Technical Report No. 47. Experiences described also include the clientʹs instruction of a full-scale grouting trial preceding the permanent works grouting and aspects of grouted tendon replacement. Emphasis is given to practical considerations that are important for a successful grouting operation.
Keywords
Stress intensity factors , Stereo vision , Mode I/II
Journal title
PROCEEDINGS OF INSTITUTION OF CIVIL ENGIN (PACKAGE)
Serial Year
2001
Journal title
PROCEEDINGS OF INSTITUTION OF CIVIL ENGIN (PACKAGE)
Record number
32542
Link To Document