Title of article :
A simulation based analysis of cycle time distribution, and throughput in semiconductor backend manufacturing
Author/Authors :
Sivakumar، Appa Iyer نويسنده , , Chong، Chin Soon نويسنده ,
Issue Information :
روزنامه با شماره پیاپی سال 2001
Pages :
-58
From page :
59
To page :
0
Abstract :
This paper presents a preliminary analysis of the relationship between selected input and output variables in semiconductor backend manufacturing system, using a data driven discrete event simulation model. This study is of interest and importance for a better understanding of the controllable input variables in an effort to reduce factory cycle time and distribution. Our analysis quantifies the effect of varying the input variables of lot release controls, heuristic machine dispatching rules, elimination of selected processes, material handling time, set-up time, and machine up time on selected output variables of throughput, cycle time and cycle time spread. Simulation model of a semiconductor site based in Singapore is used as the base case and the effects are quantified against the base model.
Keywords :
Model predictive control , Reentrant line , Discrete event system , semiconductor manufacturing , Real-time optimization , Fluid approximation
Journal title :
COMPUTERS IN INDUSTRY
Serial Year :
2001
Journal title :
COMPUTERS IN INDUSTRY
Record number :
35190
Link To Document :
بازگشت