Title of article :
Reasons for Cost and Schedule Increase for Engineering Design Projects
Author/Authors :
Chang، Andrew Shing-Tao نويسنده ,
Issue Information :
روزنامه با شماره پیاپی سال 2002
Pages :
-28
From page :
29
To page :
0
Abstract :
Cost and schedule increases are common in engineering design projects. Some research has studied factors associated with better design performance, but the reasons for cost and schedule increases are not formally investigated. This paper identifies the reasons bottom up from four case project documents and further quantifies their contributions to cost and schedule increases. These reasons are complete and can be used to analyze the cause-effect relationship, trace responsibility, and improve performance for engineering design projects.
Journal title :
JOURNAL OF MANAGEMENT IN ENGINEERING
Serial Year :
2002
Journal title :
JOURNAL OF MANAGEMENT IN ENGINEERING
Record number :
35658
Link To Document :
بازگشت