Title of article :
DEFINING COST/SCHEDULE PERFORMANCE INDICES AND THEIR RANGES FOR DESIGN PROJECTS
Author/Authors :
Chang، Andrew Shing-Tao نويسنده ,
Issue Information :
روزنامه با شماره پیاپی سال 2001
Pages :
-121
From page :
122
To page :
0
Abstract :
Cost/schedule performance indices (C/SPIs) can indicate project performance, but they need to be operationally defined to be more adopted in practice. This paper defines C/SPIs and their values for design projects. From observing design operations, the C/SPIs were defined at project and milestone levels, and their characteristics were identified. The value ranges, representing different degrees of performance, were determined from related research and tested by real data. The results show that the values and scores derived from the defined ranges effectively differentiate performance, which means the C/SPIs and ranges are well defined. The two-level C/SPIs and value ranges can enhance the application of the earned value concept and evaluate design project performance more systematically and accurately.
Journal title :
JOURNAL OF MANAGEMENT IN ENGINEERING
Serial Year :
2001
Journal title :
JOURNAL OF MANAGEMENT IN ENGINEERING
Record number :
35723
Link To Document :
بازگشت