Title of article :
Bridge capacitor bank design and operation
Author/Authors :
Andrei، نويسنده , , R.G.، نويسنده , , Kaushik، نويسنده , , R.R.، نويسنده , , Reinaker، نويسنده , , R.W.، نويسنده ,
Issue Information :
روزنامه با شماره پیاپی سال 1996
Pages :
7
From page :
227
To page :
233
Abstract :
The concept of a bridge capacitor bank installation was presented in a previous paper [l]. This paper discusses design and operation aspects related to the installation of a bridge capacitor bank in a substation. The 138/69 kV bridge capacitor bank installation presented in [l] is analized. An automatic switching control relay scheme for the same test installation is also discussed. The control scheme takes into account the dual effect a bridge capacitor installation has upon the electrical power system: it generates reactive power on the station 138kV bus and transfers reactive power from the 69kV to the 138kV bus. An unbalance protection scheme preventing the cascading type failure of the capacitor units in the 138/69kV bridge capacitor bank is also presented. An unbalance protection scheme for high voltage, large MVAr size bridge capacitor banks is also discussed. Simple analytical formulas with practical value to evaluate the magnitude and frequency of the voltage transients generated by the energization of a bridge capacitor bank are presented. Recorded switching transient magnitudes and frequencies are compared with calculated values.
Keywords :
bridge capacitor bank , switching transient , reactivepower , recovery voltage , interruptingcapability , unbalanceprotection , switching control.
Journal title :
IEEE TRANSACTIONS ON POWER DELIVERY
Serial Year :
1996