Author/Authors :
Bauer، نويسنده , , T.، نويسنده , , Lips، نويسنده , , H.P.، نويسنده , , Thiele، نويسنده , , G.، نويسنده , , Tylutki، نويسنده , , T.، نويسنده , , Uder، نويسنده , , M.، نويسنده ,
Abstract :
According to IEC 700 and IEEE 857, operational
tests on HVDC thyristor modules can be performed either in a
six-pulse back-to-back test circuit or in a qynthetic test circuit.
Because of the high rating of modern thyristors the use of a sixpulse
bridge configuration would require facilities with a high
installed capacity. In a synthetic test circuit even high current
and voltage stresses can be represented using less than U100 of
that installed capacity. Thus synthetic test circuits are an economical
alternative to test a representative part of a modern
thyristor valve.
The paper describes the operational tests on thyristor modules
for the Sylmar East Restoration Project wlhich were completely
carried out in a synthetic test circuit.