Author/Authors :
Boaventura، نويسنده , , W.C.، نويسنده , , Lopes، نويسنده , , I.J.S.، نويسنده , , Rocha، نويسنده , , P.S.A.، نويسنده , , Coutinho، نويسنده , , R.M.، نويسنده , , Castro، نويسنده , , F.، نويسنده , , Jr.، نويسنده , , Dart، نويسنده , , F.C.، نويسنده ,
Abstract :
The paper presents the results of tests performed in the
grounding system of an energized high voltage substation. Three
different methods for the grounding evaluation are discussed and
compared. Results show the promising capability of the alternative
testing methods as well as the data processing methodologies. A
new method, named “Transition Method”, has proved to have some
advantages over the currently used methods.
Keywords :
Power System Electromagnetic Compatibility , Substation Grounding , Safety. , Grounding Measurements