• Title of article

    Safety considerations when placing a person with tools in an air gap to change porcelain and glass insulators on transmission systems of 345 kV and above, using ladder and aerial lift methods

  • Issue Information
    روزنامه با شماره پیاپی سال 2002
  • Pages
    4
  • From page
    805
  • To page
    808
  • Abstract
    This paper provides general considerations for determining working clearances required to carry out live line barehand insulator change out work on energized power lines operating at 345 kV and above. It is intended to focus on a limited number of procedures and will only address one common structure configuration. This paper is intended to be used in conjunction with IEEE 516 Guide for Maintenance Methods on Energized Power Lines.
  • Keywords
    bare hand work , glassinsulators , air gap , Aerial lift methods , live line work , porcelain insulators.
  • Journal title
    IEEE TRANSACTIONS ON POWER DELIVERY
  • Serial Year
    2002
  • Journal title
    IEEE TRANSACTIONS ON POWER DELIVERY
  • Record number

    400408