Title of article :
Predicting the accumulated number of plugged tubes in a steam generator using statistical methodologies
Author/Authors :
Yuh-Ming Ferng، نويسنده , , Chin Nan Fan، نويسنده , , Bau Shei Pei، نويسنده , , Hsuen-Nien Li، نويسنده ,
Issue Information :
روزنامه با شماره پیاپی سال 2008
Pages :
7
From page :
1912
To page :
1918
Abstract :
A steam generator (SG) plays a significant role not only with respect to the primary-to-secondary heat transfer but also as a fission product barrier to prevent the release of radionuclides. Tube plugging is an efficient way to avoid releasing radionuclides when SG tubes are severely degraded. However, this remedial action may cause the decrease of SG heat transfer capability, especially in transient or accident conditions. It is therefore crucial for the plant staff to understand the trend of plugged tubes for the SG operation and maintenance. Statistical methodologies are proposed in this paper to predict this trend. The accumulated numbers of SG plugged tubes versus the operation time are predicted using the Weibull and log–normal distributions, which correspond well with the plant measured data from a selected pressurized water reactor (PWR). With the help of these predictions, the accumulated number of SG plugged tubes can be reasonably extrapolated to the 40-year operation lifetime (or even longer than 40 years) of a PWR. This information can assist the plant policymakers to determine whether or when a SG must be replaced.
Journal title :
Annals of Nuclear Energy
Serial Year :
2008
Journal title :
Annals of Nuclear Energy
Record number :
406566
Link To Document :
بازگشت