Comparing contributors to time and cost performance in building projects
Author/Authors :
Sunil M. Dissanayaka، نويسنده , , Mohan M. Kumaraswamy، نويسنده ,
Issue Information :
روزنامه با شماره پیاپی سال 1999
Abstract :
Identifying the relative strengths of the linkages between procurement sub-systems and project performance was initially hypothesized to be useful for developing guidelines for the formulation of a performance-oriented construction procurement system. A comprehensive model was developed to incorporate all significant procurement sub-systems variables, together with ‘non-procurement’ related (or ‘intervening’) variables to explore and evaluate such linkages. The multiple regression technique was applied to analyze the data from 32 Hong Kong-based building projects and the results were compared with reality. The results suggest that procurement sub-systems variables are less significant than the non-procurement related variables in predicting time and cost performance levels on Hong Kong building projects.
Keywords :
Procurement , Modelling , Performance , Regression , Hong Kong
Journal title :
Building and Environment
Journal title :
Building and Environment