Title of article :
Performance improvement of the combined cycle power plant by intake air cooling using an absorption chiller
Author/Authors :
S. Boonnasa، نويسنده , , P. Namprakai، نويسنده , , T. Muangnapoh، نويسنده ,
Issue Information :
روزنامه با شماره پیاپی سال 2006
Pages :
11
From page :
2036
To page :
2046
Abstract :
This paper studies how to improve the capacity of the combined cycle (CC) power plant which has been operated for 8 years. The most popular way is to lower intake air temperature to around 15 °C (ISO) and 100% RH before entering the air compressor of a gas turbine (GT). Thailand has 3 seasons: winter, summer and rainy season. According to 2003 Bangkok monthly weather data, all year ambient temperature is higher than 15 °C. This research proposes a steam absorption chiller (AC) to cool intake air to the desired temperature level. It could increase the power output of a GT by about 10.6% and the CC power plant by around 6.24% annually. In economic analysis, the payback period will be about 3.81 years, internal rate of return 40%, and net present value 19.44 MUS$.
Keywords :
Air cooler , economics , Monthly analysis , Uncertainty , Gas turbine
Journal title :
Energy
Serial Year :
2006
Journal title :
Energy
Record number :
416870
Link To Document :
بازگشت