• Title of article

    Incentive pricing and economic profitability of load management program

  • Author/Authors

    J.N. Sheen، نويسنده ,

  • Issue Information
    روزنامه با شماره پیاپی سال 2006
  • Pages
    17
  • From page
    2193
  • To page
    2209
  • Abstract
    This study considers both the internal and external costs of the utility in deriving the avoided capacity cost (ACC) and the avoided operating cost (AOC) induced in the power system in Taiwan (Taipower) caused by the implementation of load management (LM) program. The ACC comprises the avoided generation cost and the avoided network capacity cost. Meanwhile, the AOC is calculated by considering the differences between the total and specific time period energy consumption ratios before and after the implementation of the LM program. This study also develops a financial analysis method using least-cost and benefit-cost models to assess the financial profitability of implementing LM program from a participantʹs point of view. The design and construction of a partial load-leveling eutectic salt cooling energy storage air conditioning (CES) system in a target office building in Kaohsiung, Taiwan, is discussed in order to simulate the cost-benefit of the CES system from the perspective of the utility and from that of the participant. The results of this case study confirm the effectiveness of the developed models in simulating the economic benefits of implementing LM program from the perspectives of both the utility and the participant.
  • Keywords
    Avoided cost , Pollutant cost , Cooling energy storage air conditioner
  • Journal title
    Energy
  • Serial Year
    2006
  • Journal title
    Energy
  • Record number