Key Transmission Planning Issues
Author/Authors
Eric Hirst، نويسنده , , Brendan Kirby، نويسنده ,
Issue Information
روزنامه با شماره پیاپی سال 2001
Pages
12
From page
59
To page
70
Abstract
One conclusion: economies of scale in transmission investment argue for overbuilding, rather than underbuilding, transmission. It is substantially cheaper per GW-mile to construct a higher-voltage line than a lower-voltage line.