On-Site Generation and Pricing Policies for a Local Distribution Company: A Utility Line Is “Used and Useful” Even if It’s Not in Use
Author/Authors :
Sheldon Switzer، نويسنده ,
Issue Information :
روزنامه با شماره پیاپی سال 2004
Pages :
9
From page :
30
To page :
38
Abstract :
A distribution demand ratchet could provide an alternative to standby charges for distribution, so that wires costs are recovered based on the maximum demand recorded for a customer over the past year. This proposal would eliminate kWh charges for the collection of wires costs and rely on demand as a good proxy for the facilities required for the reliable delivery of energy to the customer.